Find tenders

Apply filter Clear
Drag a column header and drop it here to group by that column
TenderPublication date Closing date
04 May 201801 Jun 2018
P0427 - The Residential Redevelopment of the Former Birmingham City University Campus, Perry Barr'
Birmingham was awarded the honour of hosting the 2022 Commonwealth Games in December 2017. This privilege brings with it a number of obligations as the host city, one of which is the provision of sufficient residential accommodation to house around 6,500 athletes during the Games period. Birmingham City Council is seeking for the appointment of a building contractor for the residential redevelopment of the former Birmingham City University campus, Perry Barr, demolition of further existing structures, complete the enabling works, temporary services and infrastructure works for the Games mode 'overlay' and to complete legacy conversion for future residential tenures.
Location : West Midlands, England, United Kingdom
04 May 201830 Jul 2018
Track Repairs Danbydale U2329
North End Farm, Danbydale U2329 Path construction and drainage along a narrow rural track between fences approx.80m long To include: - Turn off water at top of track (A) - Scrap to full width, infill deep ruts, Lay and compact subbase and surface layer aggregate (A - B) - Replace gates (A & B) - SSSI access route and drainage at point A - low impact machinery Work can not start until September (bird nesting) and must be completed by end of November Site visit 8th June 18 2pm - please confirm attendance
Location : Helmsley, England, United Kingdom
02 May 201808 Jun 2018
Felt roof covering & new roof lights for Block 1, Wal;worth Enterprise Centre
The works will comprise of installing a felt flat roofing system with insulation, as the roof repair is over 30%, the current building regulation of Approved Document L2 for insulation will be required. The current roof light system roof lights contains 6nr older wire-glass roof lights (containing asbestos) and 6nr domed roof lights, the contractor will be required to build over and around the existing 6nr wire-glass roof lights and leave the existing lights in situ. This is due to small quantities of asbestos identified in these areas and their removal would cause too much disruption to the current tenants. The 6nr domed roof lights will also require adjusting to allow for insulation, however these can be either build like the wire-glass roof lights if necessary or the covering changed in order to allow for height adjustment.
Location : Andover, England, United Kingdom
02 May 201808 Jun 2018
Over-Cladding Roofing System, Walworth Enterprise Centre
The property comprises a one storey building which comprised of 38 commercial units. The property is understood to be built in the 70s with a currently with a flat roof covering 1654sqm. Currently the roof of block one has an asphalt flat roof with each of the 12nr roof lights spanning across 2 units and part of the corridor which lead to the various units. The works will comprise of installing an over-cladding roofing system (matching the neighbouring block), with corresponding roof lights installed directly over the existing roof lights, the existing roof lights on the flat roof will be left in-situ under the new roofing system. Further details are available in the documents.
Location : Andover, England, United Kingdom
02 May 201823 May 2018
Track Repairs Plum Tree Farm, Danbydale (EVW)
To provide drainage and surface improvements along a 180m long track. The track provides access to farm fields and facilitates the Esk Valley Walk Regional Trail (Public Footpath).
Location : Helmsley, England, United Kingdom
30 Apr 201831 Jul 2018
LTA000ETT18300069
Supply and Installation of Mechanical Services for Kim Chuan Depot Extension for Circle Line 6.
Location : Singapore, Singapore
24 Apr 201824 May 2018
Highway Capital Improvement Projects Term Contract
The proposed works covered under the Highways Capital Improvement Projects Term Contract typically but not exhaustively include:New kerbing and footway works.Carriageway realignment, reconstruction, planing and surfacing works.Junction improvement works.Traffic Signal Junctions and Controlled Crossings (Puffin, Toucan and Pegasus)Installation of Bus Stops and pedestrian crossing point to DDA standards.Provisions for cycling.Installation of street furnitureTraffic calming features. Railway Station Car ParksCanal towpath works.
Location : England, United Kingdom
24 Apr 201831 May 2018
Highways Works on A171
Highways Verge Works North of A171 Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9 Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm- dust. Install drainage provision to prevent surface water discharging onto the highway Extension of tarmac area and extension of dropped kerb from field access to crossing area (approx. 4m x 1m) Crossing to be constructed in accordance with Standard Detail B4 and E6W Existing highway drainage grip relocated downhill of the proposed crossing Surface levelling along bridleway route, relocation of stone mound South of A171 Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9 Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm-dust. Provision to prevent surface water discharging onto the highway Installation of 5m of dropped kerb to the highway surface Crossing to be constructed in accordance with Standard Detail B4 and E6W Ancillary Works Fencing Erection of approximately 150m additional stock fence (15cm x 15cm uprights centred at 1.5m) as shown on plan 2 Gates Installation of 1 no. 5'6ft bridle gate and 2 no. 12ft field gate and side rails to leave stock proof at location shown on plan 2 Road Surfacing Installation of a 10m wide band of high friction surfacing to HD37 (DMRB 7.5.2) the width of the carriageway (similar colour to the carriageway) Signage Erection of 2 no. triangular warning signs to be erected to warn drivers eastbound and westbound of the crossing point to DMRB Volume 8 Section 2 Part 2 (TD 26/17) Dry Stone Wall Dismantle and rebuild approximately 10 m of Dry Stone Wall plus supply stone for and construct an additional 10m of stone wall in accordance with plan 2 Spoil Management Excess spoil to be relocated to Skelder top car park and used to re-profile existing bunds
Location : Helmsley, England, United Kingdom
30 Sep 201630 Jun 2018
Request for Proposal: Demolition Contractor (Auckland) Panel
Housing New Zealand (HNZ) is seeking proposals from suitably resourced and experienced organisations to join a panel of demolition contractors. The panel will be used by HNZ to select/invite contractors to submit proposals for demolition projects in the Auckland region. Demolition contractors who are interested in being a member of the panel must download the Request for Proposals (RFP) documents from: www.tenderlink.com/hnzc/ To download the RFP you must be registered on the HNZC Tenderlink portal, if you’re not registered select the ‘registration’ tab at the top of the homepage.
Location : New Zealand
17 Dec 201410 Oct 2023
Select List of Approved Contractors
The Select List ofApprovedContractorsis open for applications. *Please note, if youhave alreadyregistered to be on the approved contractors list you do not need to re-apply. Please do not express an interest here. Complete the on-line application form, for further information and the online application formvisit the website below:ww w.kent.gov.uk/business/property/become-an-approved-contractor
Location : England, United Kingdom
  • Sort Ascending
  • Sort Descending
  • Clear Sorting
  • Group By
  • Ungroup
  • Columns